Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13600155

- Product Categories
- Friendly Links
Information Name: | Sewage treatment, Shanxi Runtong environmental (certified), Shanxi sewage treatment |
Published: | 2014-12-05 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Sewage treatment, Shanxi Runtong environmental (certified), Shanxi, Shanxi sewage treatment provided by Run-Environmental Engineering Limited. Run-Environmental Engineering Co., Ltd. Shanxi (www.sxruntong.com) is specialized in the "sewage treatment, waste gas treatment, dust handling" of the enterprise, the company of "honesty, hard service" concept, to provide you with the most quality products and services. Welcome to inquire! Contact: generation manager. Perhaps we buried sewage treatment equipment understand, but we know how for buried sewage treatment equipment for maintenance it? Here Environmental Engineering Co., Ltd. Shanxi Runtong give you an answer about, care must be taken not have chunks of sewage solids into the device in order to avoid clogging pipes and pumps with orifice damage; 2, the device must manhole cover, to prevent accident or fall into bulk solid material; 3, into the buried sewage treatment equipment sewage PH value must sewage treatment equipment between 6-9, acidic to slightly alkaline will affect the normal growth of the biofilm; 4, buried sewage treatment equipment fan generally runs about six months once the oil needs to be replaced in order to improve the life of the fan; 5, must ensure that the fan air intake flow. Integrated wastewater treatment equipment mixture flow from left to right to push its operating cycle accumulation process as a settling tank through a lot of regeneration, with the active sludge wastewater treatment, which can effectively degrade organic matter in sewage; intermediate reaction cell proceed aeration, the mixture has a high absorption into the further degradation of organic matter in sewage integrated wastewater treatment equipment and then the right side of the pool of people subjected to precipitation, the supernatant was treated effluent that is discharged from the fixed weir; while in the mixture from Left to right in the plug-flow process, "the left side of the pool will be activated sludge flowing into the middle of the pool and then into the right side of the pool, the sludge re-allocation in the pool. After a certain time the above process, close the left side intake buried sewage treatment equipment, open intermediate intake, on the left to stop the aeration tank, gas and water continue to flow to the right from the middle of the pool pool, these two processes is a transition section, a short time and then close up the middle of the water If you turn on the right side of the slag pool water intake from the right, then to the right start aeration tank of sewage treatment works, one on the left side after a static sedimentation pond drainage, water flow from right to left, to complete a cycle. |
Admin>>>
You are the 21429 visitor
Copyright ©2025 GuangDong ICP No. 10089450, Run-Environmental Engineering Co., Ltd. Shanxi All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21429 visitor
Copyright ©2025 GuangDong ICP No. 10089450, Run-Environmental Engineering Co., Ltd. Shanxi All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility