Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13600155
| No.13600155
- Product Categories
- Friendly Links
| Information Name: | Run-green (Figure) | Shanxi hospital sewage treatment | sewage treatment |
| Published: | 2014-11-24 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Installation of a sewage treatment equipment requirements, base buried sewage treatment equipment installed base map and diagram, ready to install basic plan sizes prevail, good concrete slab, the foundation requires an average pressure 5t / m2, the foundation must be level and should At the end of the maintenance period pouring the concrete foundation to be installed, such as equipment installed in the floor below the foundation from the ground floor elevation relative size Figure prevail, while digging around the width, length must be more than 500mm from the sideline basis for pipe installation. 2, the pipeline should be installed to connect the device in place when considering the good, the weight must be in place by manual equipment at the time, with the crane tonnage Shanxi integrated wastewater facilities, on-site installation of the order in place a control chart, cylinder position, orientation can not misplaced, mutual spacing must be correct. 3, according to the installation diagram, connecting pipes, connecting pipes fastened with a rubber mat after a good equipment in place, so that the connection does not leak. 4, buried sewage treatment equipment after installation device must be connected with the foundation floor fixed, absolute guarantee not to go up the Shanxi mobile devices buried sewage treatment equipment, to be injected into the water at the same time (no sewage, water or other device tap water instead), fullness must reach more than 70%, to prevent floating equipment. Also, check the good of each pipeline leaks. Each pipe junctions must test the water does not leak, while equipment from ground water to rise, leaving the device dislocation and tilt. 5. After the installation is complete no wrong, you can fill with soil compaction equipment four weeks with a gap and leveling the ground filling should pay attention to: (1) Equipment manhole cover must be about 50mm above the floor; (2) people can not let the soil clogging the air intake hole cover. 6, the control lines and equipment cabinet turned Shanxi sewage treatment equipment, pay attention to the wiring underwater aerator and submersible pump motor rotation, such as the control cabinet to be placed in the basement ventilation, keep dry, the general control cabinet not be placed in the open air. Beware of the sun, rain and so on. Control panel and wiring in order to avoid leakage of sewage treatment head, burned the control board. Installation and maintenance of a sewage treatment equipment, basic: WSZ series of devices such as placed in the floor above, just a piece of equipment to prepare the same shape as the basis for concrete floor. Base pressure must be greater than 4T / m2, also required level and smooth. The device buried in the floor below the foundation level must be less than or equal to the device level and to ensure that no rain water, is generally plain concrete foundation (reinforcement depending on local geology whether the case may be). 2. Installation: Installation diagram according to place each box in turn place the cabinet position, direction is not misplaced, spacing each other must be accurate, and piped. Injecting equipment in the water, check the pipes for leaks, without the box around the casing until the equipment inspection holes and leveling the ground. The electronic control box control lines and pump is turned on, the electronic control box and the power is turned on, pay attention to the fan wiring, steering motor, the fan must be referred to in the same direction. Run-green (Figure) | Shanxi hospital sewage treatment | sewage treatment provided by the Shanxi Run-Environmental Engineering Limited. Run-Environmental Engineering Co., Ltd., Shanxi (www.sxruntong.com) strong, credible, in Taiyuan, Shanxi sewage treatment equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Runtong into the brilliant green and you work for a better future! |
Admin>>>
You are the 21429 visitor
Copyright © GuangDong ICP No. 10089450, Run-Environmental Engineering Co., Ltd. Shanxi All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21429 visitor
Copyright © GuangDong ICP No. 10089450, Run-Environmental Engineering Co., Ltd. Shanxi All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

