Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13600155

- Product Categories
- Friendly Links
- home > Supply > Shanxi hospital sewage treatment equipment, sewage treatment equipment, environmental protection Runtong
Shanxi hospital sewage treatment equipment, sewage treatment equipment, environmental protection Runtong
Information Name: | Shanxi hospital sewage treatment equipment, sewage treatment equipment, environmental protection Runtong |
Published: | 2014-11-21 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Rapid development of China's sewage treatment industry in Shanxi mine water treatment equipment, the overall development in the fast growing, mainly in the rapid expansion of the sewage treatment capacity, sewage treatment rate has improved steadily, sewage treatment and other aspects of rapid growth. 2010 municipal sewage treatment plant daily processing capacity of 102.62 million cubic meters, an increase of 13.4% compared to the end of 2009, the urban sewage treatment rate reached 76.9%. As of the end of September 2011, national domestic, county completed a total of 3,077 urban sewage treatment plants, processing capacity of 136 million m3 / day. Urban sewage and garbage treatment facilities to promote the environmental protection industry, the 2020 urban sewage treatment rate will not be less than 90%, China's sewage treatment business market is vast. In addition, the state policy to encourage the use of recycled water, will also provide a broad market space wastewater treatment business. Grim situation of China's sewage treatment construction, the lower the county and towns sewage treatment rate of the status quo, for the construction of wastewater treatment market, operators have invested huge investment in space. Installation requirements for a sewage treatment equipment, base buried sewage treatment equipment installation diagram and basic diagram, prepared a plan to install base sizes prevail, good concrete slab foundation requires an average pressure 5t / m2, the foundation must be level and should After pouring the concrete foundation at the end of the maintenance period to be installed, such as the equipment installed in the floor below the foundation from the ground floor elevation relative to prevail in Figure size while digging around the width, the length must be more than 500mm from the sideline basis Shanxi district sewage treatment equipment, for pipe installation. 2, pipeline installation and connection should be considered good when the device in place, the device must weight the device according to the instructions in place, with the crane tonnage size, installation place the order on-site sewage treatment equipment, cylinder position control map, the direction is not misplaced mutual spacing must be correct. 3, according to the installation diagram, connecting pipes, connecting pipes fastened with a rubber mat after a good equipment in place, so that the connection does not leak. 4, buried sewage treatment equipment after installation equipment and floors must be connected to a fixed base, so that the device does not absolutely guarantee the flow of floating, while the need to inject water (no sewage, water or tap water instead of the other) in the device, fullness must more than 70%, to prevent equipment float. Also, check the good of each pipeline leaks. Each tube junctions must test the water does not leak, but equipment from surface water rose Shanxi sewage treatment equipment, leaving the device dislocation and tilt. 5. After the installation is complete no wrong, you can fill with soil compaction equipment four weeks with a gap and leveling the ground filling should pay attention to: (1) Equipment manhole cover must be about 50mm above the floor; (2) people can not let the soil clogging the air intake hole cover. 6, the cabinet control lines and equipment is turned on, pay attention to the underwater aerators and submersible pump motor wiring steering, such as basements control cabinet to be ventilated place, keep dry, generally can not be placed in the control cabinet open. Beware of the sun, rain and so on. In order to avoid leakage control panel and wiring head, burned the control board. Shanxi hospital sewage treatment equipment, sewage treatment equipment, environmental protection provided by the Run-Run-Environmental Engineering Co., Ltd., Shanxi. Run-Environmental Engineering Co., Ltd., Shanxi (www.sxruntong.com) strong, credible, in Taiyuan, Shanxi sewage treatment equipment industry has accumulated a large number of loyal customers. The company better work attitude and continuous improvement through innovative ideas will lead Run into the brilliant green and you work for a better future! |
Admin>>>
You are the 21429 visitor
Copyright © GuangDong ICP No. 10089450, Run-Environmental Engineering Co., Ltd. Shanxi All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21429 visitor
Copyright © GuangDong ICP No. 10089450, Run-Environmental Engineering Co., Ltd. Shanxi All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility